Alpharetta GA 30009 Alside Mezzo Window Project | Phase 1 | Additional Photos

Phase 1 included the installation of 11 Alside Mezzo Double Hung Windows and capping of the Exterior Window Frames of the New Windows with Alside Aluminum High-Performance G8 Trim Coil (30 yr. Limited Warranty)

Check out the difference between the New Windows (Top) vs. the old wood windows not replaced yet (Bottom) in the following Photos