After Installation, the Exterior Window Frames of the New Windows were capped with Alside Aluminum High-Performance G8 Trim Coil (30 yr. Limited Warranty)
After and Before Photos follow…
After Installation, the Exterior Window Frames of the New Windows were capped with Alside Aluminum High-Performance G8 Trim Coil (30 yr. Limited Warranty)
After and Before Photos follow…
> Remove Old Wood Windows and Haul-Away
> Install New Upgraded Simonton Asure Energy Efficient Double Pane Replacement Windows
Windows Installed:
> Cap Exterior Window Frames with Alside Aluminum High-Performance G8 Trim Coil (30 yr. Limited Warranty)
> Clean-Up upon Project Completion
The New Windows included Low-E Glass, Argon Gas, Double Strength Glass, Foam Wrap and Half Screens
They also featured 2 Air-Locs, Constant Force Stainless Steel Balance System, Balance Covers and Simonton Double Lifetime Limited Transferable Warranty
After Installation and Before Installation Photos of the Front of House Windows follow…
In addition, the Exterior Window Frame was Capped with Alside Aluminum High-Performance G8 Trim Coil (30 yr. Limited Warranty)
Stay tuned for more Photos from this Window Replacement Project