“Work in Progress” Photos from the Marietta HardiePlank Siding | Window | Painting Project

Check out the Photos documenting Progress of the following: 

  • Installation of New Simonton Asure Replacement Windows
  • Removal of Existing Siding, Fascia, Soffit, Window Trim and Door Trim
  • Installation of OSB Sheathing with a Vapor Barrier and Flashing over Window & Door Frames
  • Installation of HardiePlank CedarMill Siding
  • Installation of New Factory Primed HardieTrim Fascia, HardieSoffit, Window Trim and Door Trim
  • Thorough Pressure Washing and Prep Work
  • Painting of 2 Coats on All Surfaces 

Final Photos from this HardiePlank Siding | Window | Painting | Gutter | Gutter Guard System Project to follow tomorrow